i CONTENTS
ii ACRONYMS
iii PREAMBLE
iv MAJOR HIGHLIGHTS
1 INTRODUCTION
1.0 Background
1.1 Electricity Act 2003, National Electricity Policy 2005 and Tariff Policy 2016
1.2 Power Scenario in the Country
1.3 Various Initiatives of the Government
1.4 Digital Initiatives
ANNEXURES
1.1 Status of Ultra Mega Power Projects
2 REVIEW OF CAPACITY ADDITION DURING 12TH FIVE YEAR PLAN (2012-17)
2.0 Introduction
2.1 12th plan Capacity Addition Target from Conventional Sources
2.2 Capacity Addition from Conventional Sources during 12th Plan
2.3 Additional Capacity Addition achieved During 12th Plan(Not included in Target Capacity Addition of 88,537 MW)
2.4 A Comparison of 12th Plan with Previous Five Year Plans
2.5 Coal Based Thermal Capacity Addition
2.6 Projects Slipping from 12th Plan Capacity Addition Target
2.7 Major Reasons for Slippage of Projects from 12th Plan
2.8 Renovation and Modernisation Programme
2.9 Captive Power Plants
2.10 Capacity Addition during 12th Plan from Renewable Energy Sources
2.11 Conclusions
ANNEXURES
2.1 State-Wise Sector-Wise Capacity Commissioned/Slipped during 12th Plan as on 31.3.2017 (2012-17)
2.2 List of Projects Commissioned during 12th Plan as on 31.3.2017
2.3 List of Projects slipped from 12th Plan Capacity Addition Target as on 31.3.2017
2.4 Details of Achievements of LE and R&M Programme during 12th Plan up to 31.03.2017
3 DEMAND SIDE MANAGEMENT, ENERGY EFFIICIENCY AND CONSERVATION
3.0 Background
3.1 Energy Conservation Act and Formation of Bureau of Energy Efficiency
3.2 Assessment of Energy Efficiency Measures and Achievements till 12th Plan.
3.3 Projections of Energy Savings and Peak Avoided
3.4 Demand Side Management and Energy Efficiency Targets for 2017-2022 and 2022-27
3.5 Measures to be Adopted to Achieve the Target
3.6 Achievements and Plans with respect to Missions of Climate Change
3.7 Conclusion and Recommendations
ANNEXURES
3.1 State-wise Energy Savings targets for the years 2017-18 to 2026-27
4 DEMAND PROJECTIONS
4.0 Introduction
4.1 Demand Assessment by Central Electricity Authority- Electric Power Survey Committee
4.2 Methodology adopted
4.3 Policy Initiatives of Government affecting Electricity Demand
4.4 Overview of Electricity Demand Projection
4.5 Captive Power Plants (CPP)
4.6 Conclusions
ANNEXURES
4.1 State-wise/UT-wise Electrical Energy Requirement (Utilities) (Ex-Bus) (MU)
4.2 State-wise/UT-wise Peak Electricity Demand (Utilities) (MW)
5 GENERATION PLANNING
5.0 Introduction
5.1 Options for Power Generation In India
5.2 Generation from Conventional Sources In India
5.3 Generation from Renewable Energy Sources
5.4 Principles of Generation Planning
5.5 Planning Tools - Details of Planning Models
5.6 Planning Approach
5.7 Norms Adopted for Reliability Criteria
5.8 Planning Norms
5.9 Generation Expansion Planning during the years 2017-22 and 2022-27 (Base Case)
5.10 Results of Generation Expansion Planning Studies for the Period 2017-22 and 2022-27
5.11 Alternative Scenario for Capacity Addition
5.12 Conclusions
ANNEXURES
5.1 List of hydro projects under construction/concurred for likely benefits during 2017-22
5.2 List of Nuclear power plants under construction for likely benefits during 2017-22
5.3 List of Nuclear power plants under construction for likely benefits during 2022-27
5.4 List of Coal Based Projects under construction for likely benefits during 2017-22 (as on 31.03.2017)
5.5 List of Projects considered for Retirement by March, 2022 (as on August,2017)
5.5(A) List of Projects considered for Retirement as per New Environmental Norms
5.6 List of Projects considered for Retirement during 2022-27
5.7 List of Projects of Hydro Imports from Neighbouring Countries during 2017-22
5.8 List of thermal projects uncertain for benefits during 2017-22
5.9 List of thermal projects under various stages of construction for benefits beyond 2017-22
6 RENEWABLE ENERGY SOURCES
6.0 Introduction
6.1 Global Scenario of Electricity Generation From Renewable Energy Sources
6.2 Renewable Energy Sources
6.3 Potential of Renewable Energy Generation in India
6.4 Development of Renewables in India
6.5 Renewable Energy Target by 2021-2022
6.6 Projection of Renewable Energy Generation
6.7 Recent Achievement in Renewable Energy in India
6.8 Recent Renewable Energy Initiatives
6.9 Generation Profile of Solar and Wind
6.10 Integration of Renewable Energy Sources in the Grid
6.11 Balancing Reserves
6.12 Conclusions
ANNEXURES
6.1 State-Wise Details of Estimated Potential for Renewable Power in India
6.2 State-Wise Installed Capacity of Grid Interactive Renewable Power as on 31.03.2017
6.3 Tentative State-Wise Break-Up of Renewable Power Target to be achieved by the Year 2022 for cumulative achievement of 175 GW of Installed Capacity
7 HYDRO POWER IN INDIA
7.0 Introduction
7.1 Hydro-Electric Power Potential and Development
7.2 Hydro Power – A Flexibile Solution
7.3 Pumped Storage Plants-Best Friend of Electricity Grid
7.4 Importance of Hydro in Present Scenario
7.5 Current Issues and Challenges
7.6 Policy Initiatives Taken for Increasing the Hydro Capacity
7.7 Conclusions
8 GAS BASED POWER PLANTS
8.0 Introduction
8.1 Background
8.2 Present Status
8.3 Advantages of Gas Based Power Plants
8.4 Capacity Addition During 2017-22 and Gas Requirement
8.5 Gas Based Power Plants as Peaking Plants
8.6 Steps Taken by Government to overcome Shortage of Gas
8.7 Scheme for Utilization of Gas Based Generation Capacity
8.8 Recommendations
ANNEXURES
8.1 Cumulative Report on Fuel Supply/Consumption for Gas Based Power Stations in the Country for the period of April’16 to March’17
8.2 List of Under Construction gas based power plants
9 COAL REQUIREMENT
9.0 Introduction
9.1 Coal Supply Scenario
9.2 Coal Demand and Supply
9.3 Coal Demand and Availability in the years 2021-22 & 2026-27
9.4 New Initiatives for Addressing Issues Related to Coal Supply to the Power Plants
9.5 Coal Washeries in India
9.6 Lignite
9.7 Conclusions
10 KEY INPUTS
10.0 Introduction
10.1 Capacity Addition Plan
10.2 Availability of Equipment
10.3 Availability of Key Materials
10.4 Rail Transportation
10.5 Road transportation
10.6 Ports
10.7 Inland Waterways
10.8 LNG Regasification & Pipelines for transportation of Natural Gas
10.9 Inputs for Renewable Energy Projects
10.10 Land and Water for Thermal Stations
10.11 Construction Machinery
10.12 Conclusions and Recommendations
ANNEXURES
10.1 PPP projects in ports
11 FUND REQUIREMENT
11.0 Introduction
11.1 Fund Requirement for the period 2017-22
11.2 Fund Requirement for the period 2022-27
11.3 Sources of Funds
ANNEXURES
11.1 Assumptions for estimating Capital Cost of Power Projects
11.2 Assumptions for estimating Capital Cost of Power Projects Phasing of expenditure of generation projects, for the periods 2017-22 and 2022-27
12 EMISSIONS FROM POWER SECTOR
12.0 Introduction
12.1 Emission from Thermal Power Stations
12.2 Steps Taken by Thermal Power Stations to reduce Emissions from Power Plants
12.3 New Emission Standards for Thermal Power Plants
12.4 Implications of New Emission Standards on Power Sector
12.5 Carbon Emissions from Power Sector
12.6 Impact on CO2 Emissions due to Capacity Addition from Supercritical Technology Based Coal Power Stations.
12.7 Impact on CO2 Emissions due to Huge Capacity Addition from Renewable Energy Sources
12.8 Projections of Carbon emissions in 2021-22 and 2026-27
12.9 Initiative of Government of India to Reduce Carbon Emissions
12.10 Country’s Stand on Climate Change-INDCs
12.11 Conclusions
13 RESEARCH AND DEVELOPMENT IN POWER SECTOR
13.0 Introduction
13.1 R&D Challenges During 2017-22 and Beyond
13.2 R&D Initiatives of Generation Sector
13.3 R&D in Transmission
13.4 R&D in Distribution
13.5 R&D in Renewable Energy
13.6 R&D in Micro grids
13.7 R&D in Communication System
13.8 R&D in Environment
13.9 Infrastructure for Testing and Certification
13.10 Challenges in Technology Management
13.11 Initiatives for Improving R&D in the Power Sector
13.12 Recommendations
14 HUMAN RESOURCE DEVELOPMENT
14.0 Introduction
14.1 Manpower Assessment
14.2 Manpower Availability
14.3 Training Need Assessment
14.4 Funding
14.5 Recommendations
15 CONCLUSIONS AND RECOMMENDATIONS
15.1 12th Plan Capacity Addition
15.2 Demand Side Management
15.3 Demand Projections
15.4 Capacity Addition Requirement
15.5 Thermal
15.6 Fuel Requirements
15.7 Hydro
15.8 Renewable Energy
15.9 Key Inputs
15.10 Fund Requirements
15.11 Environment
15.12 R&D in Power Sector
15.13 Human Resource |
i 목차
ii 약어
iii 서문
iv 주요 하이라이트
1. 소개
1.0 배경
1.1 전기 법 2003, 국가 전기 정책 2005 및 관세 정책 2016
1.2 국가의 전력 시나리오
1.3 정부의 다양한 이니셔티브
1.4 디지털 이니셔티브
부록
1.1 울트라 메가 파워 프로젝트 현황
2 12차 5년 계획(2012-17)중 용량 추가 검토
2.0 소개
2.1 기존 자원의 12차 계획 용량 추가 목표
2.2 12차 계획 중 기존 자원에서 용량 추가
2.3 12차 계획 중 추가 용량 추가 달성 (목표 용량 추가 88,537MW에 포함되지 않음)
2.4 12차 계획과 이전 5 년 계획의 비교
2.5 석탄 기반 열용량 추가
2.6 12차 계획 용량 추가 목표에서 미끄러지는 프로젝트
2.7 12차 계획에서 프로젝트가 누락된 주요 이유
2.8 개조 및 현대화 프로그램
2.9 종속된 발전소
2.10 12차 계획 중 재생에너지원에서 용량 추가
2.11 결론
부록
2.1 제12차 계획(2012-17년) 동안 31.3.2017년 (2012-17년)에 따라 국가-현황 부문-현황 용량 커미셔닝/슬립
2.2 2017년 3월 31일 기준 12차 계획 중 위탁된 프로젝트 목록
2.3 2017년 3월 31일 기준 12차 계획 용량 추가 목표에서 누락된 프로젝트 목록
2.4 2017년 3월 31일까지 12차 계획 기간 동안 LE 및 R&M 프로그램의 성과에 대한 세부 정보
3 수요 측면 관리, 에너지 효율성 및 보존
3.0 배경
3.1 에너지 절약법 및 에너지 효율 국 구성
3.2 12차 계획까지 에너지 효율 측정 및 성과 평가
3.3 에너지 절약 및 피크 회피 예측
3.4 2017-2022 및 2022-2027년 수요측 관리 및 에너지 효율 목표
3.5 목표 달성을 위해 채택해야 할 조치
3.6 기후 변화 임무에 관한 성과 및 계획
3.7 결론 및 권장 사항
부록
3.1 2017-18 ~ 2026-27년 국가 별 에너지 절약 목표
4 수요 예측
4.0 소개
4.1 중앙 전력청 전력 조사위원회 수요 평가
4.2 채택 된 방법론
4.3 전력 수요에 영향을 미치는 정부의 정책 이니셔티브
4.4 전력 수요 예측 개요
4.5 종속된 발전소 (CPP)
4.6 결론
부록
4.1 상태 별 / UT별 전기 에너지 요구 사항 (유틸리티) (Ex-Bus) (MU)
4.2 국가 별 / UT별 최대 전력 수요 (유틸리티) (MW)
5 발전계획
5.0 소개
5.1 인도의 발전 옵션
5.2 인도의 기존 자원에서 생성
5.3 재생에너지원에서 생성
5.4 발전 계획의 원리
5.5 계획 도구-계획 모델 세부 정보
5.6 계획 접근법
5.7 신뢰성 기준에 채택된 규범
5.8 계획 규범
5.9 2017-22년 및 2022-27년 동안 발전 확장 계획(기본 사례)
5.10 2017-22 및 2022-27 기간 발전 확장 계획 연구 결과
5.11 용량 추가를 위한 대체 시나리오
5.12 결론
부록
5.1 건설중인 수력 프로젝트 목록 / 2017-22 년 동안 가능한 이익에 대해 동의
5.2 2017-22년 동안 예상되는 이익을 위해 건설중인 원자력 발전소 목록
5.3 2022-27년 동안 가능한 이익을 위해 건설중인 원자력 발전소 목록
5.4 2017-22년 동안 예상되는 이익을 위해 건설중인 석탄 기반 프로젝트 목록 (2017년 3월 31일 기준)
5.5 2022년 3월까지 폐지 예정 사업 일람 (2017 년 8 월 기준)
5.5 (A) 새로운 환경 규범에 따라 은퇴를 고려한 프로젝트 목록
5.6 2022-27년 은퇴를 고려한 프로젝트 목록
5.7 2017-22년 인근 국가의 수력 수입 프로젝트 목록
5.8 2017-22년 혜택이 불확실한 열 프로젝트 목록
5.9 2017-22 이후 혜택을 위한 다양한 건설 단계의 열 프로젝트 목록
6 재생에너지 자원
6.0 소개
6.1 재생에너지원에서 발전하는 글로벌 시나리오
6.2 재생에너지원
6.3 인도 재생에너지 생성의 잠재력
6.4 인도의 재생에너지 발달
6.5 2021-2022년까지 재생에너지 목표
6.6 재생에너지 생성의 전망
6.7 인도 재생에너지의 최근 성과
6.8 최근 재생에너지 이니셔티브
6.9 태양열과 풍력 발전 프로파일
6.10 그리드에서 재생에너지 자원 통합
6.11 보유 자원 밸런스
6.12 결론
부록
6.1 인도의 재생 가능 전력을 위한 정부의 예상 잠재력 세부 사항
6.2 2017년 3월 31일 기준 그리드 인터랙티브 신재생전력의 주정부 설치 용량
6.3 설치 용량 175GW의 누적 달성을 위해 2022 년까지 달성 할 재생 가능 전력의 잠정적인 국가별 분할 목표
7 인도의 수력 발전
7.0 소개
7.1 수력 발전 잠재력과 발전
7.2 수력 발전-유연한 솔루션
7.3 펌프식 저장 플랜트-전력망의 가장 좋은 친구
7.4 현재 시나리오에서 수력의 중요성
7.5 현재 문제와 도전
7.6 수력 발전 용량 증가를 위한 정책 이니셔티브
7.7 결론
8 가스 기반 발전소
8.0 소개
8.1 배경
8.2 현재 상태
8.3 가스 기반 발전소의 장점
8.4 2017-22 년 동안 용량 추가 및 가스 요구 사항
8.5 피킹 플랜트로서의 가스 기반 발전소
8.6 가스 부족 극복을 위해 정부가 취한 조치
8.7 가스 기반 발전 용량 활용 방안
8.8 권장 사항
부록
8.1 '16년 4월 ~ '17년 3월 국내 가스 기반 발전소 연료 공급 / 소비 누적 보고서
8.2 건설 중 가스 기반 발전소 목록
9 석탄 요구 사항
9.0 소개
9.1 석탄 공급 시나리오
9.2 석탄 수요와 공급
9.3 2021-22년 및 2026-27년 석탄 수요 및 가용성
9.4 발전소에 석탄 공급과 관련된 문제를 해결하기 위한 새로운 이니셔티브
9.5 인도 석탄 세광장
9.6 갈탄
9.7 결론
10 핵심 전문 지식
10.0 소개
10.1 용량 추가 계획
10.2 장비 가용성
10.3 주요 자료의 가용성
10.4 철도 운송
10.5 도로 운송
10.6 포트
10.7 내륙 수로
10.8 천연 가스 수송을 위한 LNG 재가스화 및 파이프라인
10.9 재생에너지 프로젝트를 위한 전문 지식
10.10 화력 발전소를 위한 토지와 물
10.11 건설 기계
10.12 결론 및 권장 사항
부록
10.1 항구의 PPP 프로젝트
11 자금 요구 사항
11.0 소개
11.1 2017-22 기간 동안 필요한 자금
11.2 2022-27 기간 동안 필요한 자금
11.3 자금 출처
부록
11.1 전력 프로젝트의 자본 비용 추정을 위한 가정
11.2 전력 프로젝트의 자본 비용을 추정하기 위한 가정 2017-22 및 2022-27 기간 동안 발전 프로젝트의 예비 단계
12 전력 부문에서 배출
12.0 소개
12.1 화력 발전소에서 방출
12.2 화력 발전소에서 발전소의 배출을 줄이기 위해 취한 조치
12.3 화력 발전소에 대한 새로운 배출 표준
12.4 전력 부문에 대한 새로운 배출 표준의 의미
12.5 전력 부문의 탄소 배출
12.6 초임계 기술 기반 석탄 발전소의 용량 추가로 인한 CO2 배출에 대한 영향.
12.7 재생에너지원의 막대한 용량 추가로 인한 CO2 배출에 미치는 영향
12.8 2021 ~ 22년 및 2026 ~ 27년 탄소 배출량 전망
12.9 탄소 배출 감소를 위한 인도 정부의 이니셔티브
12.10 기후 변화에 대한 국가의 입장 -INDC
12.11 결론
13 전력 분야의 연구 및 개발
13.0 소개
13.1 2017-22년 및 그 이후의 R&D 과제
13.2 발전 부문의 R&D 이니셔티브
13.3 변속기 R&D
13.4 유통 R&D
13.5 재생에너지 연구 개발
13.6 마이크로 그리드의 R&D
13.7 통신 시스템 R&D
13.8 환경 연구
13.9 테스트 및 인증을 위한 인프라
13.10 기술 관리의 도전
13.11 전력 부문의 R&D 개선을 위한 이니셔티브
13.12 권장 사항
14 인적 자원 개발
14.0 소개
14.1 인력 평가
14.2 인력 가용성
14.3 교육 필요 평가
14.4 자금
14.5 권장 사항
15 결론 및 권장 사항
15.1 12차 계획 용량 추가
15.2 수요측 관리
15.3 수요 예측
15.4 용량 추가 요구 사항
15.5 열
15.6 연료 요구 사항
15.7 수력
15.8 재생에너지
15.9 핵심 전문 지식
15.10 자금 요건
15.11 환경
15.12 전력 부문 R&D
15.13 인적 자원 |