Einspeisevergütung (FiT)


신재생에너지법 2017 (EEG 2017)에 근거하여 정부 고시 가격으로 재생에너지 발전전력을 매입하는 제도.

 

[ 지열, 육상풍력, 해상풍력 FiT 금액 ]

구분

FiT

지열

25.20ct/kWh

육상풍력

4.66ct/kWh

해상풍력

3.90ct/kWh

 

[ 수력 FiT 금액 ]

출력 규모

FiT

≤ 500kWh

12.40ct/kWh

≤ 2MWh

8.17ct/kWh

≤ 5MWh

6.25ct/kWh

≤ 10MWh

5.48ct/kWh

≤ 20MWh

5.29ct/kWh

≤ 50MWh

4.24ct/kWh

> 50MWh

3.47ct/kWh

 

[ 태양광 FIT 금액 ]

출력 규모

FiT

≤ 10kWh

12.70ct/kWh

≤ 40kWh

12.36ct/kWh

≤ 750MWh

11.09ct/kWh

 

[ 매립, 하수 및 광산 가스 FiT 금액 ]

구분

출력 규모

FiT

매립가스

500kWh

8.17ct/kWh

5MWh

5.66ct/kWh

하수가스

500kWh

6.49ct/kWh

5MWh

5.66ct/kWh

광산가스

1MWh

6.54ct/kWh

5MWh

4.17ct/kWh

> 5MWh

3.69ct/kWh

 

[ 바이오매스 FiT 금액 ]

출력 규모

FiT

≤ 150kWh

13.32ct/kWh

≤ 500kWh

11.49ct/kWh

≤ 5MWh

10.29ct/kWh

≤ 20MWh

5.71ct/kWh

 

출처 : 독일연방경제에너지부

원문 링크 : https://www.bmwi.de/Redaktion/EN/Downloads/renewable-energy-sources-act-2017.pdf%3F__blob%3DpublicationFile%26v%3D3





Ausschreibungen (재생에너지 입찰 제도)


FIP (Feed-in Premium) 입찰 제도. 재생가능에너지원법 2017 (EEG 2017)에 근거하여 재생에너지에 대한 재정을 지원. 일정 이상 규모의

신재생 발전사업자는 FIT를 대신하여 FIP를 적용 받으며, 최저 입찰 경쟁을 통해 월별 지정된 용량까지 정부에서 전력을 구매함

- 입찰 대상 : 750kW 이상의 태양광, 풍력 및 150kW 이상 바이오매스

 

 

[ 태양광 입찰 결과 ]

입찰 날짜

2020년 2월

2020년 3월

2020년 6월

2020년 7월

2020년 9월

입찰용량(MW)

100

300

150

300

400

실제 입찰 량(MW)

100

300

96

193

257

낙찰 건수

18

51

21

30

75

최저 가격 (ct/kWh)

3.55

4.64

4.9

4.69

4.80

최고 가격 (ct/kWh)

5.21

5.48

5.4

5.36

5.39

평균 가격 (ct/kWh)

5.01

5.18

5.27

5.18

5.22

 

 

[ 육상풍력 입찰 결과 ]

입찰 날짜

2020년 2월

2020년 3월

2020년 6월

2020년 7월

2020년 9월

입찰용량(MW)

900

300

900

300

400

실제 입찰 량(MW)

900

300

826

275

367

낙찰 건수

66

20

61

26

75

최저 가격 (ct/kWh)

5.76

5.74

5.90

6.00

4.80

최고 가격 (ct/kWh)

6.20

6.20

6.20

6.20

5.39

평균 가격 (ct/kWh)

6.18

6.07

6.14

6.14

5.22

 

 

[ 바이오매스 입찰 결과 ]

입찰 날짜

2020년 4월

2020년 11월

입찰용량(MW)

100

100

실제 입찰 량(MW)

168

-

낙찰 건수

38

-

최저 가격 (ct/kWh)

10.28

-

최고 가격 (ct/kWh)

16.40

-

평균 가격 (ct/kWh)

13.99

-

 

 

[ 교차기술 (태양열 및 육상 풍력) 입찰 결과 ]

입찰 날짜

2020년 4월

2020년 11월

입찰용량(MW)

200

200

실제 입찰 량(MW)

200

-

낙찰 건수

30

-

최저 가격 (ct/kWh)

4.97

-

최고 가격 (ct/kWh)

5.61

-

평균 가격 (ct/kWh)

5.33

-

 

재생에너지원별 입찰 과정 및 조건, 결과 등 세부 내용은 독일 연방네트워크청 웹페이지 참고

원문 링크 : https://www.bundesnetzagentur.de/DE/Sachgebiete/ElektrizitaetundGas/elektrizitaetundgas-node.html






Renewable Energy Sources Act (EEG 2017)

EGG는 재생가능 에너지의 확장을 위한 중앙 제어 수단. 2050년까지 재생에너지를 통한 전력 공급 비율을 80%까지 목표로 함

 

원문 목차

한글 목차(구글 번역)

Renewable Energy Sources Act (EEG 2017)

신재생에너지법 (EEG 2017)

Part 1 General provisions

Section 1 Purpose and aim of the Act

Section 2 Principles of the Act

Section 3 Definitions

Section 4 Development corridor

Section 5 Development in Germany and abroad

Section 6 Registering the development

Section 7 Statutory obligations

Part 2 Connection, purchase, transmission and distribution

Division 1 General provisions

Section 8 Connection

Section 9 Technical requirements

Section 10 Establishment and use of the connection

Section 10a Operation of metering points

Section 11 Purchase, transmission and distribution

Division 2 Capacity expansion and feed-in management

Section 12 Expansion of grid system capacity

Section 13 Compensation

Section 14 Feed-in management

Section 15 Hardship clause

Division 3 Costs7

Section 16 Grid system connection

Section 17 Capacity expansion

Section 18 Contractual agreement

Part 3 Payment of market premium and feed-in tariff

Division 1 Types of entitlement to payment

Section 19 Entitlement to payment

Section 20 Market premium

Section 21 Feed-in tariff

Section 21a Other direct selling

Section 21b Allocation to a form of sale, switching

Section 21c Procedure for the switch

Division 2 General provisions on payment

Section 22 Competition-based determination of the market premium

Section 22a Pilot onshore wind energy installations

Section 23 General provisions on the level of the payment

Section 23a Special provision on the level of the market premium

Section 23b Pro-rata payment

Section 24 Payment entitlements for electricity from several installations

Section 25 Start, duration and end of entitlement

Section 26 Advance payments and settlement date

Section 27 Offsetting

Section 27a Payment entitlement and self-supply

Division 3 Auctions

Subdivision 1 General auction provisions

Section 28 Volume of auctions Section 29 Announcement

Section 30 Requirements to be met by bids

Section 30a Auction procedure

Section 31 Securities

Section 32 Award procedure

Section 33 Disqualification of bids

Section 34 Disqualification of bidders

Section 35 Announcement of the awards and value to be applied

Section 35a Cancellation of awards

Subdivision 2 Auctions for onshore wind energy installations

Section 36 Bids for onshore wind energy installations

Section 36a Securities for onshore wind energy installations

Section 36b Maximum value for onshore wind energy installations

Section 36c Special precondition for awards in the grid expansion area

Section 36d Disqualification of bids for onshore wind energy installations

Section 36e Expiry of awards for onshore wind energy installations

Section 36f Alterations following the issuing of an award for onshore wind energy installations

Section 36g Special auctioning rules for citizens’ energy companies

Section 36h Value to be applied for onshore wind energy installations

Section 36i Duration of payment entitlement for onshore wind energy

installations

Subdivision 3 Auctions for solar installations

Section 37 Bids for solar installations

Section 37a Securities for solar installations

Section 37b Maximum value for solar installations

Section 37c Special precondition for awards for disadvantaged areas; power for the Länder to issue ordinances

Section 37d Return and expiry of awards for solar installations

Section 38 Payment authorisation for solar installations

Section 38a Issuance of payment authorisations for solar installations

Section 38b Value to be applied for solar installations

Subdivision 4 Auctions for biomass installations

Section 39 Bids for biomass installations

Section 39a Securities for biomass installations

Section 39b Maximum value for biomass installations

Section 39c Disqualification of bids for biomass installations

Section 39d Expiry of awards for biomass installations

Section 39e Alterations following the issuing of an award for biomass installations

Section 39f Inclusion of existing biomass installations

Section 39g Duration of payment entitlement for biomass installations

Section 39h Special payment provisions for biomass installations

Subdivision 5 Technology-neutral auctions

Section 39i Joint auctions for onshore wind and solar installations

Section 39j Innovation auctions

Division 4 Statutory determination of the payment

Subdivision 1 Values to be applied

Section 40 Hydropower

Section 41 Landfill, sewage treatment and mine gas

Section 42 Biomass

Section 43 Fermentation of biowaste

Section 44 Fermentation of manure

Section 44a Reduction of values to be applied for electricity from biomass

Section 44b Common provisions for electricity from gases

Section 44c Other common provisions for electricity from biomass

Section 45 Geothermal energy

Section 46 Onshore wind energy up to 2018

Section 46a Reduction of values to be applied for electricity from onshore wind energy up to 2018

Section 46b Onshore wind energy from 2019

Section 47 Offshore wind energy up to 2020

Section 48 Solar radiation energy

Section 49 Reduction of the values to be applied for electricity from solar radiation energy

Subdivision 2 Payments for flexibility

Section 50 Entitlement to payment for flexibility

Section 50a Flexibility supplement for new installations

Section 50b Flexibility premium for existing installations

Division 5 Legal consequences and penalties

Section 51 Reduction of the payment entitlement in the case of negative prices

Section 52 Reduction of the payment entitlement in the case of violations of obligations

Section 53 Reduction of the feed-in tariff

Section 53a Reduction of the payment entitlement for onshore wind energy installations

Section 53b Reduction of the payment entitlement in the case of guarantees of regional origin

Section 54 Reduction of the payment entitlement in the case of auctions for solar installations

Section 55 Penalties

Section 55a Reimbursement of securities

Part 4 Equalisation scheme

Division 1 Nationwide equalisation

Section 56 Delivery to the transmission system operator

Section 57 Equalisation between grid system operators and transmission system operators

Section 58 Equalisation amongst the transmission system operators

Section 59 Selling by the transmission system operators

Section 60 EEG surcharge for electricity suppliers

Section 60a EEG surcharge for undertakings with intensive electricity costs and for railway undertakings

Section 61 EEG surcharge for final consumers and self-suppliers

Section 61a Exemptions from the obligation to pay the EEG surcharge

Section 62 Retrospective corrections

Section 63 Principle

Section 64 Undertakings with intensive electricity costs

Section 65 Railway undertakings

Section 66 Submission of applications and effect of decisions

Section 67 Transformation of undertakings

Section 68 Withdrawal of the decision, information, right of access

Section 69 Obligation to cooperate and to provide information

Section 69a Obligation of customs administration authorities to provide

information

Part 5 Transparency

Division 1 Obligations to communicate and publish information

Section 70 Principle

Section 71 Installation operators

Section 72 Grid system operators

Section 73 Transmission system operators

Section 74 Electricity suppliers

Section 75 Auditing

Section 76 Information to be provided to the Federal Network Agency

Section 77 Information to be provided to the public

Division 2 Electricity labelling and prohibition of multiple sale

Section 78 Electricity labelling in accordance with the EEG surcharge

Section 79 Guarantees of origin

Section 79a Guarantees of regional origin

Section 80 Prohibition of multiple sale

Section 80a Prohibition of cumulation

Part 6 Legal protection and official procedures

Section 81 Clearing house

Section 82 Consumer protection

Section 83 Temporary legal protection

Section 83a Legal protection in the case of auctions

Section 84 Use of maritime shipping lanes

Section 85 Tasks of the Federal Network Agency

Section 85a Stipulation of maximum values for auctions

Section 85b Right of information and data transmission

Section 86 Provisions on fines

Section 87 Fees and expenses

Part 7 Authorisations to issue ordinances, reports, transitional provisions

Division 1 Authorisation to issue ordinances

Section 88 Authorisation to issue ordinances on auctions for biomass

Section 88a Authorisation to issue ordinances on cross-border auctions

Section 88b Authorisation to issue ordinances on grid expansion areas

Section 88c Authorisation to issue ordinances on joint auctions for onshor wind and solar installations

Section 88d Authorisation to issue ordinances on innovation auctions

Section 89 Authorisation to issue ordinances on the generation of electricity from biomass

Section 90 Authorisation to issue ordinances on sustainability requirements for biomass

Section 91 Authorisation to issue ordinances on the equalisation scheme

Section 92 Authorisation to issue ordinances on guarantees of origin and guarantees of regional origin

Section 93 Authorisation to issue ordinances on the register of installations

Section 94 Authorisations to issue ordinances on the special equalisation scheme

Section 95 Further authorisations to issue ordinances

Section 96 Common provisions

Division 2 Reports

Section 97 Progress report

Section 98 Monitoring report

Section 99 (repealed)

Division 3 Transitional provisions

Section 100 General transitional provisions

Section 101 Transitional provisions for electricity from biogas

Section 102 (repealed)

Section 103 Transitional and hardship provisions for the special equalisation scheme

Section 104 Further transitional provisions

Annex 1 (to Section 23a)

Annex 2 (ad Section 36h)

Annex 3 (to Section 50b)

Annex 4 (ad Sections 64, 103)

제1편 일반 조항

제1절 법의 목적과 목적

제2절 법의 원칙

제3절 정의

제4절 개발 회랑

제5절 독일 및 해외 개발

제6절 개발 등록

제7절 법적 의무

제2편 연결, 구매, 송배전

Division 1 총칙

제8절 연결

제9절 기술 요구 사항

제10절 연결 설정 및 사용

제10절a 측정 지점 작동

제11절 구매, 송배전

Division 2 용량 확장 및 FIM

제12절 그리드 시스템 용량 확장

제13절 보상

제14절 Feed-in management (FIM)

제15절 계약유지조항

Division 3 비용 7

제16절 그리드 시스템 연결

제17절 용량 확장

제18절 계약상 합의

제3편 시장 프리미엄 및 FiT 지급

Division 1 지급 자격 유형

제19절 지급 자격

제20절 시장 프리미엄

제21절 FiT

제21절a 기타 직접 판매

제21절b 판매 형태에 대한 할당, 전환

제21절c 전환 절차

Division 2 지급에 관한 일반 조항

제22절 시장 프리미엄의 경쟁 기반 결정

제22절a 파일럿 육상 풍력 에너지 설비

제23절 지급 수준에 관한 일반 조항

제23절a 시장 프리미엄 수준에 대한 특별 조항

제23절b 비례 배분 지급

제24절 여러 설비의 전기 요금 지급 권한

제25절 자격의 시작, 기간 및 종료

제26절 선지급 및 결산일

제27절 상쇄

제27절a 지급 자격 및 자체 공급

Division 3 경매

Subdivision 1 일반 경매 조항

제28절 경매 볼륨 제 29 발표

제30절 입찰 충족 요건

제30절a 경매 절차

제31절 증권

제32절 낙찰 절차

제33절 입찰의 실격

제34절 입찰자의 실격

제35절 적용 할 상과 가치의 발표

제35절a 낙찰 취소

Subdivision 2 육상 풍력 에너지 설비에 대한 경매

제36절 육상 풍력 에너지 설비 입찰

제36절a 육상 풍력 에너지 설비를 위한 증권

제36절b 육상 풍력 에너지 설비의 최대값

제36절c 그리드 확장 영역에서 낙찰을 위한 특별 전제 조건

제36절d 육상 풍력 에너지 설비 입찰의 실격

제36절e 육상 풍력 발전 설비에 대한 계약 만료 기간

제36절f 육상 풍력 에너지 비치에 대한 낙찰 이후의 변경

제36절g citizens’ energy companies를 위한 특별 경매 규칙

제36절h 육상 풍력 에너지 설비에 적용되는 값

제36절i 육상 풍력 에너지에 대한 지불 자격 기간

Subdivision 3  태양광 설비를 위한 경매

제37절 태양광 설비 입찰

제37절a 태양광 설비를 위한 증권

제37절b 태양광 설비의 최대값

제37절c 불우한 지역에 대한 보상을 위한 특별 전제 조건; 주의 법령을 발행 할 수 있는 권한

제37절d 태양광 설치에 대한 보상 반환 및 만료

제38절 태양광 설비에 대한 지불 승인

제38절a 태양광 설비에 대한 지불 승인 발급

제38절b 태양광 설치에 적용될 값

Subdivision 4 바이오 매스 설치를 위한 경매

제39절 바이오매스 설비 입찰

제39절a 바이오매스 설비를 위한 증권

제39절b 바이오매스 설비의 최대값

제39절c 바이오매스 설비 입찰의 실격

제39절d 바이오매스 설비에 대한 보상 만료

제39절e 바이오매스 설비에 대한 상을 받은 후 변경

제39절f 기존 바이오매스 설비 포함

제39절g 바이오매스 설비에 대한 지불 자격 기간

제39절h 바이오매스 설비에 대한 특별 지불 조항

Subdivision 5 기술 중립 경매

제39절i 육상 풍력 및 태양열 설비에 대한 공동 경매

제39절j 혁신 경매

Division 4 지불의 법적 결정

Subdivision 1 적용 할 값

제40절 수력

제41절 매립, 하수 처리 및 광산 가스

제42절 바이오 매스

제43절 바이오 폐기물의 발효

제44절 분뇨의 발효

제44절a 바이오매스에서 전기에 적용되는 값의 감소

제44절b 가스 전기에 대한 공통 조항

제44절c 바이오 매스 전기에 대한 기타 공통 조항

제45절 지열 에너지

제46절 2018년까지 육상 풍력 에너지

제46절a 2018 년까지 육상 풍력 에너지의 전기 요금 감소

제46절b 2019 년의 육상 풍력 에너지

제47절 2020 년까지 해상 풍력 에너지

제48절 태양에너지

제49절 태양에너지의 전기 요금 감소

Subdivision 2 탄력성에 대한 지불

제50절 탄력성에 대한 지불 자격

제50절a 신규 설비를 위한 탄력성 보충 자료

제50절b 기존 설비에 대한 탄력성 프리미엄

Division 5 법적 결과 및 처벌

제51절 마이너스 가격의 경우 지불 자격의 감소

제52절 의무 위반의 경우 지불 자격의 감소

제53절 FiT의 감소

제53절a 육상 풍력 에너지 설비에 대한 지불 자격의 감소

제53절b 지역 원산지 보장의 경우 지불 자격의 감소

제54절 태양광 설비 경매의 경우 지불 자격의 감소

제55절 벌칙

제55절a 증권 상환

제4편 이퀄라이제이션 체계

Division 1 전국 평등화

제56절 전송 시스템 운영자에게 배달

제57절 그리드 시스템 운영자와 송전 시스템 운영자 간의 균등화

제58절 전송 시스템 운영자 간의 평등화

제59절 전송 시스템 운영자에 의한 판매

제60절 전기 공급 업체에 대한 EEG 추가 요금

제60절a 전기 비용이 집중적 인 사업 및 철도 사업에 대한 EEG 추가 요금

제61절 최종 소비자 및 자체 공급 업체에 대한 EEG 추가 요금

제61절a EEG 추가 요금 지불 의무 면제

제62절 소급수정

제63절 원칙

제64절 집약적인 전기 비용이 드는 사업

제65절 철도 사업

제66절 신청서 제출 및 결정의 효과

제67절 사업의 변화

제68절 결정, 정보, 접근권의 철회

제69절 협력 및 정보 제공 의무

제69절a 제공할 세관 행정 당국의 의무

제5편투명성

Division 1 정보 전달 및 게시 의무

제70절 원칙

제71절 설비 운영자

제72절 그리드 시스템 운영자

제73절 송전 시스템 운영자

제74절 전기 공급 업체

제75절 감사

제76절 연방 네트워크 기관에 제공할 정보

제77절 일반인에게 제공되는 정보

Division 2 전기 표시 및 다중 판매 금지

제78절 EEG 추가 요금에 따른 전기 라벨링

제79절 원산지 보증

제79절a 지역 원산지 보장

제80절 복수 매매 금지

제80절a 누적 금지

제6편 법적 보호 및 공식 절차

제81절 정보 센터

제82절 소비자 보호

제83절 임시 법적 보호

제83절a 경매의 경우 법적 보호

제84절 해상 운송로의 사용

제85절 연방 네트워크 기관의 업무

제85절a 경매에 대한 최대값 규정

제85절b 정보 및 데이터 전송 권리

제86절 벌금에 관한 규정

제87절 수수료 및 비용

제7편 조례, 보고서, 과도기 조항 발행 승인

Division 1 조례 발행 승인

제88편 바이오매스 경매에 관한 조례 발행 승인

제88편a 국경간 경매에 대한 조례 발행 승인

제88편b 그리드 확장 지역에 대한 조례 발행 승인

제88편c 해상 풍력 및 태양열 설비에 대한 공동 경매에 관한 조례 발행 승인

제88편d 혁신 경매에 관한 조례 발행 승인

제89편 바이오매스 전기 생산에 관한 조례 발행 승인

제90편 바이오매스에 대한 지속 가능성 요구 사항에 대한 조례 발행 승인

제91편 균등화 계획에 관한 조례 발행 승인

제92편 원산지 보증 및 지역 원산지 보증에 관한 조례 발행 허가

제93편 시설물 등기부 조례 발행 허가

제94편 특별 평등화 제도에 관한 조례 발행 승인

제95편 조례 발행을 위한 추가 승인

제96편 공통 조항

Division 2 보고서

제97편 진행보고

제98편 모니터링 보고서

제99편 (삭제)

Division 3 전환 조항

제100편 일반 과도기 조항

제101편 바이오가스 전기에 대한 전환 조항

제102편 (삭제)

제103편 특별 평준화 계획에 대한 경과 규정 및 고충 사항

제104편 추가 과도기 조항

부록 1 (제 23a)

부록 2 (광고 제 36h)

부록 3 (제 50b)

부록 4 (광고 제 64, 103)

출처 : 독일 연방사법부 법령정보센터

원문 링크 : http://www.gesetze-im-internet.de/eeg_2014/index.html#BJNR106610014BJNE014801360

위 게시물은 ‘공공누리 제3 유형: 출처표시+변경금지’ 조건에 따라 이용할 수 있습니다.
쿠키를 지원하지 않는 브라우저이거나 브라우저 설정에서 쿠키를 사용하지 않음으로 설정되어 있는 경우 사이트의 일부 기능(로그인 등)을 이용할 수 없으니 유의해 주시기 바랍니다.